The Russian Bitcoin mining hotspot of Buratiya is set to receive an energy upgrade with a revamped thermal power plant expected to come online before the end of 2029. According to the staterun news agency TASS, the new power plant will generate both heat and electricity, helping Buratiya create a power reserve.
Addressing Power Grid Strain
This move aims to help Ulan-Ude, the capital of Buryatia, deal with an increasing load on the power grid. The local government has noted that a sharp rise in crypto mining has been blamed for this loa. President Vladimir Putin has also pointed out that Buratiya and other areas have suffered from a rise in BTC mining.
Current Power Infrastructure
Buratiya is currently served by the Gusinoozerskaya TTP, a Sovietera construction completed in the late 1970s. The new power plant will not only generate electricity but also heat, which will be beneficial for the region.
Future Prospects
The energy upgrade is expected to provide a muchneeded boost to the region’s power infrastructure, supporting both the local community and the growing crypto mining industry. This development is seen as a step towards addressing the challenges posed by the increasing energy demands of Bitcoin mining.